Get an oversize/overweight permit
Not legal advice. Always verify with the issuing authority and the permit text before moving. Editorial copy for reference — not a substitute for the official publication.
Partial copy. Some sections are present. Gaps are marked and are not law. Never invent missing text. Page updated 7 October 2026. Permit types, the ceilings named on the page, the fee table, the King's highway and municipal sentences, and the office block are copied. The login steps are not copied.
Official publication · Ontario Ministry of Transportation
Get an oversize/overweight permit
Updated: October 07, 2026. Published: March 24, 2022.
An oversize/overweight permit is required if the dimensions or weight of the vehicle and load combined exceed the limits set out in the Highway Traffic Act. Permits are valid for Ontario's King's highways only. Driving on municipal roads may require additional permits or permission from that municipality.
The vehicle or load must be one that cannot be reduced because it could not be used for its intended purpose or function, or because it would require more than eight work hours to dismantle using appropriate resources and equipment.
A permit is not available if the overweight load is made up of more than one item, if the extra height, width, or length comes from the way the load is stacked, or if an overlength load of more than one item overhangs the rear by more than 4.65 metres from the centre of the rear-most axle.
The four types named on the page are annual permits, project permits, single trip permits, and special vehicle configuration permits.
Applications and payment are online, or by mail. Fax ended on January 1, 2026. The online system is PRIO, Permitting and Registration for International Registration Plan and Oversize/Overweight. The login page linked from this page is https://www.prio.mto.gov.on.ca/ONEnterprise/Login.aspx
Ceilings named on the page
Annual, subject to vehicle configuration: weight up to 63,500 kg; width up to 3.85 metres on multi-lane highways and 3.7 metres on 2-lane highways; length up to 25 metres; height up to 4.26 metres.
Enhanced annual: weight up to 78,000 kg; the same width and height; length up to 32 metres.
Project: weight up to 70,000 kg; width up to 4.3 metres; length up to 36.75 metres; a float trailer for a height request more than 4.26 metres.
Enhanced project: width up to 4.99 metres; length up to 45.75 metres; weight that does not need a certified superload escort.
Single trip, not a superload: weight up to 120,000 kg; width up to 5 metres; length up to 45.75 metres.
A superload exceeds 120,000 kg gross vehicle weight, or 5 metres in width, or 45.75 metres in length.
Fees
| Permit | Fee |
|---|---|
| Annual permit | $448.75 |
| Enhanced annual permit | $744.50 |
| Project permit | $291.75 |
| Single trip permit, oversize only | $66.25 |
| Single trip, overweight up to 120,000 kg, up to 100 km | $127.50 |
| Single trip, overweight up to 120,000 kg, 101 km to 500 km | $204 |
| Single trip, overweight up to 120,000 kg, over 500 km | $265.25 |
| Single trip, overweight greater than 120,000 kg, unlimited distance | $714 |
Enhanced project fees and special vehicle configuration fees are not a single amount on the page.
Contact
Ministry of Transportation, Highway Operations Permits Office, 301 St. Paul Street, 2nd Floor, St. Catharines, Ontario L2R 7R4.
Telephone 416-246-7166. Toll-free 1-800-387-7736. Email oo.permits.review@ontario.ca.
PLACEHOLDER — still needed: The account-setup steps and the list of mail-in forms are not copied.