Route Map 2 Legend
Not legal advice. Always verify with the issuing authority and the permit text before moving. Editorial copy for reference — not a substitute for the official publication.
Official publication · Oregon Department of Transportation, Commerce and Compliance Division
ODOT Route Map 2 Legend (form 8101)
Route Map 2 Legend
Generally, Route Map 2 is used to determine pilot vehicle requirements for overwidth loads. Refer to
your permit.
Certified Flagger Locations
For permitted loads or vehicles over 12 feet wide, certified flaggers as described in the Manual of
Uniform Traffic Control Devices (MUTCD) are required at the locations shown below, or the Certified
Rolling Stop method can be used. The Certified Rolling Stop method requires three pilot vehicles.
Highway Milepost Structure Location
US26 40.90 Sunset Tunnel West of Portland
US101 0.00 Columbia River Bridge Astoria
US101 35.68 Arch Cape Tunnel Manzanita
US101 64.23 Wilson River Bridge Tillamook
US101 141.68 Yaquina Bay Bridge Newport
US101 171.44 Tenmile Creek Bridge South of Yachats
US101 175.02 Big Creek Bridge South of Yachats
US101 178.42 Cape Creek Tunnel South of Yachats
US101 211.11 Umpqua River Bridge Reedsport
US101 259.65 Coquille River Bridge Bandon
OR38 39.73 Elk Creek Tunnel Elkton
OR47 61.28 Nehalem River Bridge Vernonia
OR58 56.01 Salt Creek Tunnel East of Oakridge
OR99E 29.09 Willamette River Bridge Harrisburg
OR126 19.68 Knowles Creek Tunnel West of Eugene
OR138 17.95 N Umpqua River Bridge Glide
OR238 18.04 Applegate River Bridge Jacksonville
Minimum Pilot Vehicles Required for Width
Interstate Route Map 2 Red Routes
Route Map 2 Route Map 2 see Group Map 1
and
Width Green Purple
Multilane Map 1 Black Map 1 Blue Map 1 Red
Routes Routes
Highways Routes Routes Routes
8’7” to 9’0” None None None None One Two
9’1” to 10’0” None None One One One Two
10’1” to 11’0” None None One One One Two
11’1” to 12’0” None None One Two Two Two
12’1” to 14’0” None One Two Specified on Single-Trip Permit
14’1” to 16’0” One Two Specified on Single-Trip Permit
More than 16’0” Specified on Single-Trip Permit
page 1 of 2 January 7, 2026
When one pilot vehicle is required, it shall travel in front of the oversize unit except when operating on
multilane highways it shall be at the rear of the unit. When two pilot vehicles are required, one shall be
in front and one shall be at the rear of the oversize unit. When the number of pilot vehicles specified on
the permit is different than the number required above, the permit shall take precedence.
Legal width in Oregon is 8’6”. Unless otherwise exempt by law or rule, a permit is required for
any load or vehicle that exceeds this width. Not all loads or vehicles qualify for an overwidth
permit.
Minimum Pilot Vehicles Required for Overall Length
Interstate and Route Map 2 All Other Two-Lane
Overall Length
Multilane Highways Green Routes State Highways
95’1” to 110’0” None None One
110’1” to 120’0” None One One
120’1” to 150’0” One in Rear Two Two
More than 150’0” Specified on Single-Trip Permit
Minimum Pilot Vehicles Required for Height
Height All State Highways
14’1” to 14’6” None
More than 14’6” One
Legal height in Oregon is 14’0”. Unless otherwise exempt by law or rule, a permit is required for any
load or vehicle that exceeds this height. Not all loads or vehicles qualify for an overheight permit.
Minimum Pilot Vehicles Required for Front Overhang
Front overhang exceeding 15 feet beyond Interstate and Multilane Two-Lane
the front bumper or foremost part of the State Highways State Highways
vehicle. None One
Notes on Pilot Vehicle Charts
• Number and placement of pilot vehicle(s) specified in the Special Conditions of a single-trip
permit take precedence over pilot vehicle requirements shown here.
• For authorized county roads, refer to the permit for number and placement of pilot vehicle(s) and
height devices.
• For the movement of mobile and modular units with a base width not more than 14 feet, and an
overall width not greater than 16 feet, number of pilot vehicles on Interstate and Multilane
highways may be different than what is shown above. Refer to your single-trip permit for
additional information.
• When height exceeds 14 feet 06 inches a front pilot vehicle with height pole is required, unless
the permittee has filed a declaration with CCD assuming complete and total liability for any and
all injury and damage that may result from the overheight movement.
Commerce and Compliance Division | Oregon Over-Dimension Operations
page 2 of 2 January 7, 2026
Source
- Official URL: https://www.oregon.gov/odot/MCT/Documents/RouteMap02Legend.pdf
- Accessed: 2026-09-23
- Editorial copy for Heavy Haul Reg Ref; controlling text is the issuing authority’s publication.